We buy surplus electrical cable in San Marcos
San Marcos produces institutional lots: documented, counted and often large. We review the drawings, the reel tags and the removal record, then plan a pickup around the campus calendar.

Send the lot
Six details are enough to start: what the cable is, how much there is, where it is and what condition it is in. Photos can follow by text or email.
Prefer to talk 954-740-1983A university town generates surplus on a calendar. Housing turns over between semesters, retail pads re-fit between leases, and the plants on the east side schedule work around their run schedules. Each cycle releases cable in a batch rather than a trickle, which suits a documented review.
We buy those batches. Documentation is usually already there, which changes the whole review: drawings and submittals tell us what was installed, and the removal record tells us what is now sitting on a pallet in a service yard behind the building or under a canopy.
Student housing re-fits near the university
Housing work around Texas State runs to a schedule. A building empties in May, the contractor works through the summer, and the electrical scope usually includes panel replacements, corridor lighting and a full unit rewire on each floor and in the common areas.
That leaves service cable, MC and a great deal of branch wiring in short pieces. Ask the contractor to keep the panel schedule with the lot. It tells a reviewer the age of the feeder and whether it was replaced or simply relocated.
Outlet retail and the service behind it
Outlet and big-box retail on that side of the interstate re-fits between tenants, and the service often grows while the building shell stays the same. Old service entrance cable comes out, new feeder goes in, and the removed set stays in a back-of-house corridor.
Lighting cable is the other steady item. A center-wide re-lamp can retire hundreds of feet of branch circuit in one pass. Coil it by circuit and note the gauge, because a mixed coil of twelve and ten is harder to review than two labelled ones.
East-side plants and the river corridor
Manufacturing and food processing on the east side produce motor and control cable, plus feeder from panel and drive replacements. Washdown areas are the ones to flag, since a wet jacket and a wet conductor are two different problems and only one of them can be dried out.
The river corridor adds flood exposure. Cable that went under in a storm is not reusable, and saying so early saves everyone a wasted review. Photograph the water line on the jacket if there is one, and list what was submerged.
What this page covers
The rows a buyer would fill in when reviewing this kind of lot. If your cable matches most of them, the submission is ready.
| County | Hays County |
|---|---|
| Corridors | I-35, SH-80, SH-21, river corridor |
| Typical stock | Feeder, service cable, MC, lighting cable |
| Institutional | University, school and civic lots |
| Risk note | Flood-exposed cable read as recovery |
| Access | Service yards, rear corridors, docks |
Hays County, the river and a documented pickup
San Marcos sits where I-35 meets the river, with SH-80 and SH-21 feeding the east side and the outlet corridor stacked along the interstate. Ground here floods, and a service yard near the river is not a dry store, whatever the lease says.
Institutional lots need a signature, not a handshake. Send the drawings, the removal record and the name of the person releasing the material. Freight is booked once terms are agreed, worked around the campus calendar and the retail lease calendar.
Sellers ask
Why do you ask for drawings on a university lot?
Because they show what was installed and when. A feeder size on a drawing tells us more than a faded tag, and the removal record explains why the cable came out of service.
Is cable that was underwater still acceptable?
Send it and say so plainly. Submerged cable is reviewed as recovery, never as reusable, and a water line on the jacket usually settles the question before anyone tests the insulation.
Can a facilities manager submit several buildings at once?
Yes. List each building, the service or meter it belongs to, and where the material is staged. One review covers all of it, and the pickup can run building to building in a single morning.
Do you take retail lighting cable in mixed coils?
Yes, but label the gauge. Two labelled coils review faster than one mixed coil, and a center-wide re-lamp usually produces enough of both to make the sorting worth the trouble.
Send the reel list
Six details are enough to start: what the cable is, how much there is, where it is and what condition it is in. Photos can follow by text or email.
Prefer to talk 954-740-1983