We buy surplus electrical cable in Pflugerville
A campus handover in Pflugerville leaves medium-voltage feeder, cut terminations and bus duct sections. We review the tags, the storage history and who is holding the material.

Send the lot
Six details are enough to start: what the cable is, how much there is, where it is and what condition it is in. Photos can follow by text or email.
Prefer to talk 954-740-1983The SH-130 edge of Pflugerville has become a row of multi-building campuses, and each one is wired in phases. Building one opens while building two is still being pulled, and material left over from the first phase sits on site until someone decides what to do with it.
That decision is usually a phone call. We buy medium-voltage feeder, terminations, bus duct and the 600 volt cable that did not get installed. Because these lots are large and often held by a general contractor, the first question is not what the cable is but who can release it.
MV feeder and cut terminations at handover
Medium-voltage feeder is reviewed by voltage class, conductor size, insulation type and the condition of the semicon. A reel that was never paid out is straightforward. A length that was pulled, terminated and later cut out is not, and we treat it as recovery.
Terminations are their own item. Cable ends with a kit half installed are worth photographing closely, because the semicon and the copper tape tell a buyer how far the work went. Send the tag, the length and a picture of each end.
Bus duct, feeder sections and plug-in runs
Bus duct arrives in sections and leaves in sections. Feeder busway from a service run, plug-in busway from a floor distribution, and the fittings, elbows and end closures that go with them. Sections are counted, not weighed, and the count carries the review.
Photograph the label on each section, note the amperage and the length, and keep the fittings with the run they came from. A busway with its own elbows and end closures is a complete lot. The same sections with the fittings lost are a pile of metal.
When the general contractor holds the cable
On a phased handover the surplus often belongs to the general contractor, while the electrical subcontractor is the one who wants it off the site. Both are right, and neither can move it alone. Start by naming who holds title and who signs the release.
A short written list helps: what the material is, where it sits, who owns it and who can authorize the gate. We work from that list and deal with the party holding the material. We schedule the truck after terms are agreed and access is confirmed.
What this page covers
The rows a buyer would fill in when reviewing this kind of lot. If your cable matches most of them, the submission is ready.
| County | Travis County, east of the toll road |
|---|---|
| Corridors | SH-130, SH-45, Wells Branch Parkway |
| Typical stock | MV feeder, bus duct, 600 V feeder |
| Voltage classes | 600 V, 5 kV, 15 kV, 25 kV |
| Storage | Racked indoors or on gravel aprons |
| Pickup notes | Title and release confirmed first |
SH-130, the laydown and two kinds of storage
Pflugerville's campus corridor runs east of the toll road, with laydown yards, gravel aprons and temporary buildings between the finished structures. Cable stored indoors on a rack and cable that sat outside in the sun are not the same lot, even when the tags match.
Indoor storage keeps a jacket supple and a tag readable. A summer on a gravel apron fades the print, chalks the surface and puts water in the reel if it stood upright. Tell us which is which, and photograph the outer wrap on anything that lived outside.
Sellers ask
The cable is medium voltage and was cut out of service. Do you still want it?
Yes, as recovery. Cut-out MV cable is reviewed on conductor size, insulation condition and the state of the semicon at each end. Photograph both ends and tell us how it was removed. Reuse is possible on some lengths, and we will say which.
Who signs for the material when a GC holds it?
Whoever holds title on the purchase order, or their appointed representative. We ask for a named contact and a release before the day. Cable is loaded against a signed document, and a copy goes to the party that released it.
Can bus duct be collected with the fittings loose?
Yes, but keep the fittings labeled by run. Sections are counted and matched to elbows and end closures at the yard. Loose fittings with no run number slow the review down and can turn a complete lot into parts.
How do you read a reel that sat outside for a year?
Start with the tag and the outer wrap. Faded print is expected. We look for chalked jacketing, flattened wraps and water between the layers. A reel that stood upright on gravel is the one to photograph most carefully.
Send the reel list
Six details are enough to start: what the cable is, how much there is, where it is and what condition it is in. Photos can follow by text or email.
Prefer to talk 954-740-1983