We buy surplus and removed PILC cable
Paper insulation under a lead sheath still runs through the older ducts downtown. When it comes out, the lot is handled as lead-sheathed material from the first look.

Send the lot
Six details are enough to start: what the cable is, how much there is, where it is and what condition it is in. Photos can follow by text or email.
Prefer to talk 954-740-1983PILC is the old workhorse. Paper insulation, a lead sheath over it, and often steel tape or wire armour outside that, with an outer serving to hold the whole thing together. It served downtown networks and plant distribution for most of the last century, and plenty of it is still in the ground.
When a duct run is replaced, the removed cable arrives in the lengths it was pulled in, with the lead still on and the paper exposed wherever it was cut. That changes the handling, the transport and the paperwork. It also changes how the lot is reviewed, which starts with the sheath rather than the conductor.
Paper, lead and tape: reading a PILC length
Construction reads from the outside in. An outer serving, then armour if the run needed it, then the lead sheath, then paper tapes wound over the conductor. The voltage class comes from the paper thickness, which is why the tag or the original drawings matter more here than on a plastic-insulated cable.
A PILC length is measured along the lead, not along what is left of the conductor. Cut ends are where the information lives: whether the paper is dry and pale, whether compound has migrated, and whether the lead was sealed after the cut. Photograph both ends and the sheath along its length.
Downtown ducts and the cable coming out of them
The older duct banks under the city core and around the university carry PILC that has been in service for decades. Replacement work happens in short pulls between manholes, at night, with the street closed. What comes out is short, heavy and wet, and it has to leave the site the same shift.
That timing shapes the review. A lot assembled at the curb is not sorted the way a warehouse lot is. If the manhole locations and the pull lengths are known in advance, the review can be planned around them so nothing sits on a trailer waiting for a decision.
Sealed ends, oil weeping and the lead question
PILC compound moves. On a removed length the compound migrates toward whichever end is lower, and an unsealed end will weep for days. That matters twice: it tells a buyer how the cable was handled, and it tells the hauler what to expect inside the load. Seal or bag the ends before anything is stacked.
Lead is the other half of the conversation. A lead-sheathed cable is not ordinary copper scrap and it should not be mixed with it. Say plainly that the lot is lead covered, keep it separate, and expect questions about the quantity and the condition of the sheath before transport is arranged.
What this page covers
The rows a buyer would fill in when reviewing this kind of lot. If your cable matches most of them, the submission is ready.
| Voltage classes | 5 kV to 35 kV, occasionally 69 kV |
|---|---|
| Constructions reviewed | PILC, PILC with armour, lead-covered solid type |
| Typical conductor | 4/0 AWG to 1,000 kcmil copper |
| Condition flags | Oil weeping, crushed sheath, exposed paper at cut ends |
| Site type | Downtown duct banks, industrial plants, utility yards |
Older ducts under the core and the campus grid
The densest PILC in the region sits under the streets between the Capitol and the university, where the duct system was built and rebuilt across several decades. Vaults and manholes there are tight, and a pull is measured in the distance between two of them.
Older industrial property along the rail corridors east of the city holds PILC in plant distribution as well, usually in duct banks between buildings. Both kinds of site are reviewed the same way, with access, sealing and lead handling settled before a pickup date is discussed.
Sellers ask
Is removed PILC ever reusable?
Rarely after it has been pulled. Bending, compound migration and moisture at the ends usually settle the question. New surplus PILC on original reels from a cancelled industrial project is a different matter and is reviewed as reusable where the ends are still sealed.
How should cut ends be handled before pickup?
Seal them. Tape and compound at the cut keeps moisture out of the paper and stops the compound running out onto the trailer. Bag the ends if tape is all you have. An open paper end that has been rained on is much harder to review.
Does the lead sheath change how the lot is transported?
It does. Lead-sheathed cable is kept separate from other material, documented as such, and loaded so the sheath is not crushed or torn in transit. Tell us the approximate quantity of lead-covered cable in the lot when the review is requested.
Do you take PILC with the armour still on?
Yes. Steel tape and wire armour are part of the construction and are reviewed with it. Note which one the cable carries and whether the outer serving is intact, since that affects both condition and how the load is handled.
Send the reel list
Six details are enough to start: what the cable is, how much there is, where it is and what condition it is in. Photos can follow by text or email.
Prefer to talk 954-740-1983