We buy surplus electrical cable in Buda
Buildings on the Buda frontage road change hands quickly, and each move-in leaves cable behind. We review cut feeder, tray offcuts and site lighting runs as one lot.

Send the lot
Six details are enough to start: what the cable is, how much there is, where it is and what condition it is in. Photos can follow by text or email.
Prefer to talk 954-740-1983A warehouse that turns over twice in three years accumulates a strange inventory. Not full reels, mostly: cut feeder from a panel change, tray cable from a rack reconfiguration, whips pulled out when a tenant installed its own equipment and left the old set behind.
We buy that accumulation. It is rarely tidy and rarely documented, which is why the first step is a walk-through with a phone camera rather than a manifest. Short lengths are fine. Mixed metal is fine, as long as the two are separated before the truck arrives.
What a tenant leaves in the electrical room
Service and feeder cable is the item that survives a turnover. A tenant improves a space, the service grows, and the old feeder is cut out and leaned against a wall. It is still a usable conductor if the jacket survived.
Look at the cut ends before anything else. A clean saw cut with no corrosion reads as reusable. A crushed end, a water line on the jacket or a coil that sat in a puddle reads as recovery, and we would rather hear that first.
Short cut lengths from whip work
Tenant whip installations generate the least glamorous cable on a site: six-foot and ten-foot lengths of MC, AC and cord, plus the offcuts nobody logs. Bale it by construction and by conductor size rather than by length, and write the construction on the bale.
Nothing under a few feet is worth a separate line. Coil the short pieces, tape them into bundles and write the construction on the bundle. A tidy bale of MC offcuts reviews in minutes. A pallet of loose spaghetti does not.
URD, pads and parking-lot lighting
New retail pads and the subdivisions spreading off the frontage road bring a different lot: URD from service stubs, direct-buried runs left after a transformer set, and the lighting cable from a lot that was re-lamped in a hurry and never cleaned up.
Parking-lot lighting cable is worth pulling out of the conduit rather than cutting at the base. A continuous pull is one length. Six cut stubs are six short lengths, and the review treats them accordingly, so the extra hour on the ladder pays for itself.
What this page covers
The rows a buyer would fill in when reviewing this kind of lot. If your cable matches most of them, the submission is ready.
| County | Hays County |
|---|---|
| Corridor | I-35 frontage road, Main Street, RM 967 |
| Typical stock | Feeder, tray, MC, URD, site lighting |
| Lot shapes | Cut feeder, whip offcuts, pallet remnants |
| Access | Rear docks, side yards, gated compounds |
| Who submits | Owner, broker or property manager |
Buda, the frontage road and a rear dock
Buda runs along the interstate between Austin and Kyle, with the older town on one side of I-35 and the warehouse and light-manufacturing belt on the other. Main Street and RM 967 carry the local traffic, and the frontage roads carry everything else.
Most pickups happen at a rear dock or a side yard, so tell us the dock height and whether a trailer can turn around. Residential phases off the creek need a different plan. The pickup is set after terms are agreed.
Sellers ask
Can a broker submit a lot for a tenant?
Yes, with written authority to release the material and a contact at the site. Send the address, the space number and who holds the keys. We copy the property manager on the receiving record.
Do you take cut lengths under ten feet?
We do, bundled by construction and size. Very short offcuts are reviewed on metal content rather than length, so keep copper apart from aluminum, label each bundle and note the approximate total length on the tape.
How do you handle mixed feeder and tray in one room?
Separate it before we arrive if you can: feeder by size, tray by construction. If it is already mixed, photograph the pile and we will plan the review around sorting it on site.
What does a property manager need to sign?
A short release naming the material, the address and the person handing it over. Nothing more elaborate than that. We leave a receiving record with the same details for the tenant file.
Send the reel list
Six details are enough to start: what the cable is, how much there is, where it is and what condition it is in. Photos can follow by text or email.
Prefer to talk 954-740-1983